Multi Level Unit Development

Below is an example report outline of some of the items included in our Multi Level Unit Development estimate reports.

Category Qty Unit Rate Total
2 LEVEL UP TO 235M2 QUALITY
concrete ground + timber strip upper floor; rendered brick veneer wall – timber frame inner wall – metal roof601.000 m  
M2 floor area – built in wardrobes cupboards – quality – 2 levels – 200m2 
Roof complete – by M2 floor area – pitched metal – double storey – 25 degree – corrugated steel – quality – 200m2 
Height allowance 2nd storey – timber – timber frame – pitched roof 25 & 28 degrees – 2 level – 200m2 
External service hookup – rainwater tank – plumbed to house – 5000lt slimline tank 
Brick veneer wall rendered – deduct openings – m2 rate – quality 
Internal wall deduct openings – timber/steel frame – m2 rate – quality 
Windows/ sliding doors – aluminium – per m2 of house area – 2 level house – double hung – up to 235m2 
Doors – quality – per m2 of house area – 2 level house – external + internal + garage – up to 235m2 
Electrical – quality – per m2 of house area – 2 levels – timber structures – up to 235m2 
Staircase timber complete – straight flight – 15 steps – 250mm treads / 170mm risers – quality 
External service hookup – other – includes excavation – water 
External service hookup – other – includes excavation – electrical 
External service hookup – other – includes excavation – gas 
Brick veneer wall rendered – timber frame – l/m rate – 2.4m – 8 feet – quality 
Internal wall – timber frame – l/m rate – 2.4m – 8 feet – quality 
Lintels – timber frame – per m2 of house area – 2 level house – up to 235m2 
Lintels – arch bar – per m2 of house area – 2 level – veneer masonry wall – up to 235m2 
Kitchen complete – small – services and fitout – quality 
Bathroom complete – small – services and fitout – quality 
Ensuite complete – small – services and fitout – quality 
Toilet + Basin complete – small – services and fitout – quality 
Laundry complete – small – services and fitout – quality 
Add drainage and stackwork to 2nd floor – extra over cost – 5 point stack – bathroom 
Add drainage and stackwork to 2nd floor – extra over cost – 4 point stack – ensuite 
Upgrade floor – add wet areas – convert to fibrecement from – timber T & G – quality 
External service hookup – sewer – excavate and install – 30m run 
External service hookup – stormwater – excavate and install – 45m run 
Ground floor – concrete slab waffle pod – 85mm slab 20MPa concrete – N12 bar to beams – SL72 mesh – 300mm pod – 150m2 Upper floor – timber T & G boards – quality – 100 m2 
Preliminaries double level house – fees and charges – quality – up to $500,000 – up to 235m2 
Preliminaries double level house – site works with scaffold and crane – quality- for two storey wall – up to 235m2 
Preliminaries double level house – site clean – up to 235m2 –
  
2 LEVEL UP TO 235M2 add extras
Change slope of land from flat to moderate – 15 degrees – concrete floors – block walls 601.000 m  
Extra over for sloping sites – foundation build up – blockwork – rendered – up to 1m 
Ground floor – concrete slab waffle pod – 85mm slab 20MPa concrete – N12 bar to beams – SL72 mesh – 300mm pod – 150m2
Ground floor – suspended concrete slab – rendered blockwork – – 150m2
Change wall height from 2.4 to 2.7m – quality – timber frame inner wall – brick veneer wall 601.000 m  
Brick veneer wall – timber frame – l/m rate – 2.4m – 8 feet – quality 
Brick veneer wall – timber frame – l/m rate – 2.7m – 9 feet – quality 
Internal wall – timber frame – l/m rate – 2.4m – 8 feet – quality 
Internal wall – timber frame – l/m rate – 2.7m – 9 feet – quality
TILING
Tiling – floor complete w/t grouting. – ceramic/porcelain – average 205.000 m  
Tiling – floor – ceramic/porcelain – average 
Tiling – grouting – all purpose grout – all colours
  
RENOVATE-FLOORS
Lay new floor covering – m2 rate – carpet + underlay – on slab or platform – average 275.000 m  
Carpet – laid – wool/nylon blend – average
  
Sub-Total (items, including adjustments)  

 

Total and applied GST
Total  
GST applied to Total  
Total (including GST)  